As part of Orlando International Airport’s $3.1 billion Capital Improvement Program, the Intermodal Terminal Facility and South Airport APM Complex are currently under construction.

South Airport Automated People Mover (APM)

South APM StationThe South Airport Automated People Mover (APM) complex consists of approximately 1.3 million square feet, including the station for the APM system which will connect passengers to the North Terminal via 7,500 feet of dual-lane guideway, similar to those that connect the existing gates areas to the North Terminal, as well as a 2,400-space parking garage. The South APM is scheduled to open in mid-2017.

 

 

Intermodal Terminal Facility (ITF)

ITF Transfer Level SpineThe Intermodal Terminal Facility (ITF) consists of approximately 200,000 square feet of terminal space accommodating the South APM and three regional rail systems (SunRail, Brightline, and possibly a magnetic levitation system serving the International Drive area). It will also support ground transportation activity including taxis, shuttle buses and public bus operations. The ITF is scheduled to open in 2018.